Batch houseBatching
The load is right before it leaves the yard.
A mix design is a promise on paper. What lands on your grade is whatever the plant actually weighed. So we weigh it, print it, and hand you the numbers.
Every material is weighed on its own load cell against a batch computer, and the cells are calibrated on schedule with the certificates on file at the plant. Moisture probes in the sand and rock bins read free water as the material is drawn and take that water back out of the batch, so a 5 in slump is a 5 in slump whether the stockpile has been rained on since Tuesday or baked dry since Friday.
±1%Cement
±2%Aggregate
±1%Water
±3%Admixture
ASTM C94/C94M batching tolerances. Actual batch weights print on your ticket, not a summary of them.
Design water is held back at the plant. If a load needs water on site we add it once, before discharge, up to the design water‑cement ratio, then turn 30 revolutions at mixing speed per ASTM C94 — and the addition is printed and signed for. Water past that is your call, and it comes off our strength warranty. We would rather send a second truck.
Cylinders are cast per ASTM C31, cured, and broken at 7 and 28 days. Break sheets go to whoever signed the ticket and to the engineer of record, not just into our file. Wash water is clarified in a closed circuit and rebatched, and every aggregate we batch — quarried or recycled — is graded to the same ASTM C33 envelope. Same test, same paperwork, either source.